Eurojet Succesfully Completes Tranche 2 EJ200 Engine Flight Test
Published: Wed Dec 5th, 2007Source: www.eurojet.de
Hallbergmoos, 5 December 2007. On Thursday, 29 November 2007, the first Eurofighter Typhoon with a full Tranche 2 Propulsion System configuration (two Tranche 2 engines) completed a successful 50 minute test flight from Caselle di Torino Airport (Italy). During the test, the Eurofighter IPA2 aircraft carried out subsonic and supersonic flight and handling manoeuvres in dry and reheat conditions on both engines. The EJ200 engine behaved perfectly during the tests and exceeded all expectations of in-flight verifications and successfully demonstrated the compatibility of Tranche 2 engines in a Tranche 1 aircraft.
The Tranche 2 EJ200 engines feature innovative engine control and monitoring technology, combining the functionality of the former engine mounted Digital Electronic Control Unit (DECU) and of the Engine Monitoring Unit (EMU) into a single Digital Engine Control and Monitoring Unit (DECMU).
The validation of the full Tranche 2 aircraft will be performed with an IPA7 aircraft (Tranche 2 configuration) in a flight test which is expected to be performed in mid- December 2007.
--- ends ---TAGS:
Recent News Articles
Friday, November 20, 2009
Wednesday, November 18, 2009
Tuesday, November 17, 2009
Monday, November 16, 2009
Sunday, November 15, 2009
Saturday, November 14, 2009
Thursday, November 12, 2009
Wednesday, November 11, 2009
Monday, November 9, 2009
Saturday, November 7, 2009
Thursday, November 5, 2009



